Value $ 830,000.00
Project Description:
Rectification of building defects inclusive of “Wolfin” torch on membrane system
Installation of Control joints as per Standards
Crack stitch installation and render repairs due to water ingress
Upgrade of Fire System
Rectification of waterproofing membrane on all external baconies
Installation of Cavity flasings due to defective cavitys allowing water ingress.
Work Included:
- Upgrade fire drencher system.
- External render repairs.
- Crack stitching.
- Control joint installation.
- Internal timber stair replace.
- Application torch on membrane to rooftop courtyard
- – 350m2.
- Demolish and rebuild brick planter box walls.
- Replace soil and plants to planter boxes.
- Application of a Hybuild acrylic paint externally.
- Installation of new cavity and sill flashings.
- Balcony rectification including demolition of existing
- surfaces, application of a polyurethane waterproof
- membrane and re-tiling.
- Various building maintenance works